将技术指标翻译为英文
Technical Specifications
1. Overview
The GWL high-temperature horizontal vacuum electric furnace is mainly used for vacuum sintering of alloy materials or non-metallic materials.
The GWL high-temperature vertical vacuum electric furnace consists of a vertical main unit (single chamber), vacuum system, gas charging system, water cooling system, electrical control system, etc.
2. Main Technical Parameters
3. Standard Structure and Features
3.1 Vacuum Furnace Main Unit
The vacuum furnace main unit is of vertical, single-chamber structure, consisting of furnace body, furnace door, furnace frame, heating chamber, etc.
3.1.1 Furnace Body and Furnace Door
The vacuum furnace main body sits on the furnace frame. Both the furnace body and furnace door are of double-walled water-cooled structure. The inner walls of the furnace body and furnace door are made of welded carbon steel, with a protective shell on the outermost layer.
One ½” NPT female port is provided at the center of the furnace top cover for user standby use.
One ½” NPT female port is provided at the center of the furnace door for user standby use.
Two ½” NPT female ports are provided on the furnace body for inert gas inlet (the ports are located at the upper part of the heating chamber).
In addition, two ½” NPT female ports are provided for thermocouples. One is at the top of the heating chamber, and the other is at the bottom of the heating chamber.
An emergency button for the furnace door lifting mechanism is installed on the control panel of the furnace door (loading platform).
3.1.3 Heating Chamber, Heating Elements, and Insulation Elements (to be provided by the buyer)
Tungsten-molybdenum heat shields are used as the thermal insulation hot zone.
Heating elements are made of high-purity tungsten rods.
3.2 Vacuum System and Vacuum Gauge
The vacuum system includes: 2X-30 vacuum pump, pneumatic baffle valve installed on the vacuum pipeline, connectors, gauge tubes, and their auxiliary devices. Specifically:
Automatic procedures can be set on the touch screen (automatic furnace purging, gas switching, vacuum pumping, etc. can be selected according to conditions).
3.3 Water Cooling System
The water cooling system consists of stainless steel stop valves, water inlet, drainage tank, water pressure electrical contact pressure gauge, etc. The water inlet and outlet are provided with connecting flanges, which only need to be connected to the user's circulating water system interface.
An overpressure protection device is installed on the drainage pipe. In case of water supply failure, audible and visual alarms and interlocking devices are provided, and emergency cooling water is opened.
3.4 Gas Charging System
The gas charging system consists of gas charging stop valves, gas manifold, solenoid valves, vacuum electrical contact pressure gauge, etc. This system can be used to adjust and control the vacuum degree in the furnace during the heating process.
The gas charging system pipeline is equipped with 0–20 L/min mass flow meters (one each for hydrogen and nitrogen), which can measure and be manually controlled.
A quick gas inlet system is provided for rapid replacement of the furnace atmosphere.
3.5 Pneumatic System
The pneumatic system consists of pneumatic valves, solenoid valves, oil-water separator, oil mist lubricator, pressure gauge, etc. The gas interface only needs to be connected to the user's gas source interface.
3.6 Electrical Control System
The electrical control system consists of two parts: temperature program control composed of thyristor voltage regulator and intelligent instruments, and mechanical action program control composed of programmable logic controller. It can realize:
3.6.1 Temperature Control Instrument
The temperature control instrument is one Japanese FP93, with temperature control accuracy of ±1°C.
3.6.2 Temperature and Vacuum Degree Recording Instrument
The temperature and vacuum degree recording instrument is a touch screen.
3.6.3 Temperature Measuring Thermocouple
W5Re:W26Re (Type C) thermocouples are installed for temperature control, recording, and over-temperature alarm.
One for temperature control and one for temperature measurement.
3.6.4 Programmable Logic Controller (PLC)
The logic control of equipment vacuum pumping, valve control and interlocking, heating, etc., as well as various alarms and interlock protection, are completed by the programmable logic controller (PLC), whose model is S7-200 main unit plus expansion (Siemens product).
The main electrical panels reserve 20% space for standby use. In addition, 30 cm of expansion space is reserved on the right side of the S7-200 PLC.
3.7 The control cabinet is provided with a mimic screen to visually display the working status of the vacuum furnace. It also has fault self-diagnosis functions, such as audible and visual alarms and interlock protection for total water outage, vacuum pump overload, over-temperature, over-current, over-pressure, etc.
4. Power Requirements
4.1 Power Supply: 380 V, 3-phase, 50 Hz, 145 kVA
4.2 Water Supply
4.3 Compressed Air
The compressed air pressure required by pneumatic components is 0.4–0.5 MPa.
4.4 Inert Gas (Nitrogen or Argon or Hydrogen)
Purity: 99.99–99.9995%. If pure nitrogen is used, the sintering temperature shall not exceed 800°C to prevent metallic tungsten from reacting with nitrogen to form tungsten nitride.
5. Scope of Complete Supply
6. Spare Parts
Including: all sealing rings: 1 set
Vacuum pump oil: 1 set per unit
7. The foundation drawing will be provided within one month after the contract takes effect.
The furnace body and vacuum unit are fixed to the ground with foundation bolts to prevent vibration.
8. Equipment Acceptance
8.1 Acceptance shall be carried out according to the acceptance standards in the contract signed by both parties.
8.2 Provide equipment factory certificate of conformity, packing list, and other documents.
8.3 Pre-acceptance: after debugging and inspection are qualified at Party B's factory, cold-state index acceptance shall be carried out.
8.4 Re-debugging and final acceptance at Party A's factory.
9. Training for Equipment Operators
Arrange for Party A's personnel to receive free technical training and equipment maintenance training at the manufacturer.
10. Technical Service Requirements
10.1 Warranty period: one year. During the warranty period, if any system of the equipment fails, spare parts and services shall be provided free of charge, and the service shall be timely and effective; the heating element and temperature measuring element are not covered by the warranty.
10.2 After the equipment warranty period expires, extensive preferential technical support and spare parts supply will still be provided.
11. Production cycle: two months.
Optional List
Main Component List
| Name | Specification Parameters | Manufacturer | Remarks |
|---|---|---|---|
| PLC | S7-200 | Siemens | |
| Touch screen | 7 inch | Kunlun Tongtai | |
| Transformer | 120 kW | Juxing | |
| Temperature controller | FP93 | Japan Conductivity | |
| Inspection instrument | 6 channels | Yudian | |
| Vacuum instrument | Resistance gauge | Chengdu/Shandong | |
| Industrial electrical appliances | Conventional | Chint | |
| Power regulator | SCR | Juxing | |
| Heating element | Tungsten rod | Gemei (to be provided by the buyer) | |
| Alumina hollow ball brick | 99 | ||
| Insulation material | Alumina | ||
| Vacuum furnace body | Carbon steel | Juxing | |
| Vacuum electrode | Copper | Juxing | |
| Vacuum pump | 30 L | Nanguang | |
| Thermocouple | W | Dazheng |